九九热在线视频播放,久久艹网站,香蕉午夜视频,99热免费,欧美a久久,中文永久有效幕中文永久,中文永久有效幕中文永久

Welcome to Jiaozuo Libo Light Alloy Co., Ltd.

Aluminum alloy sacrificial anode

magnesium anode, zinc anode

Telephone:

0391-7588881 +8618739187123

Jiaozuo Libo Light Alloy Co., Ltd.

News

News

Contact

Phone:18739187123

hotline:0391-7588881

E-mail:970512272@qq.com

Address:Wuzhi County, Jiaozuo City, China

Industry News

Discussion on the whole process supervision of test pile

  • Author:Libo
  • Source:wwww.xzvcne.com
  • Date:2021-06-11
  • Click:0

Discussion on the whole process supervision


The risk control system of data life cycle management. Combined with the special equipment management system, to realize the whole process of long distance gas transmission pipeline safety regulation, pipeline enterprises should be formed in the long-term management practice the pipeline integrity management as the core based on the particularity in the long-distance pipeline in special equipment system, in the current in each construction stage of long distance gas transmission pipeline inspection and test results of original records are kept by each test unit is responsible for, Such as steel plate sampling and test analysis results, non-destructive testing negatives of pipe factory, formation process of girth welding process, girth welding non-destructive testing negatives, etc. For each construction unit, the preservation and maintenance of data and materials is a huge investment, while the operation unit in the use of these resources, but faced with the embarrassment of "no way to check up". Therefore, it is an important prerequisite for realizing the whole-process supervision of pipeline enterprises to establish a long-term mechanism for sharing these data resources so as to facilitate the risk control service during operation and operation. (2) Quality supervision in the whole process of pipeline construction, pipeline quality mainly depends on the quality of steel pipe manufacturing and on-site welding and construction quality two major links. The steel pipe manufacturing process basically realizes the whole process supervision of each link of manufacturing. In terms of field construction, with the accumulation of long distance pipeline construction experience and the improvement of technical level, the field construction quality of domestic long distance pipeline has made a qualitative leap, but the pipeline construction process is still the link with the most concentrated pipeline risk. In this regard, supervision should be strengthened in two aspects: first, risk analysis should be carried out for each construction process to determine the content and indicators of supervision. If the contact is used in the link of the dead mouth, the stress index of the strong force group of the mouth should be determined, and measures should be made to control the occurrence of the strong force group. The second is to establish effective quality supervision system, the index of the construction process have traceability, construction quality control indicators have verifiability, especially to take cover engineering process supervision link, should focus on establishing effect validation experiments, such as for directional drilling pipe exists in the process of damage, such as scratch, deformation can increase in the volume of a length to be dragged back, The appearance and mechanical properties of the redundant backhaul pipe joints were analyzed to determine the backhaul quality of the directional drill.


Online
聯(lián)系方式

熱線電話

18739187123

上班時(shí)間

周一到周五

公司電話

0391-7588881

呼伦贝尔市| 中方县| 周至县| 三台县| 庆元县| 东乡| 商洛市| 勃利县| 南江县| 舒兰市| 弥渡县| 屏南县| 桐城市| 嘉黎县| 来安县| 安图县| 永嘉县| 湘阴县| 永德县| 西华县| 石台县| 绥芬河市| 大同市| 垦利县| 外汇| 云安县| 星座| 上栗县| 新田县| 苏尼特右旗| 丰镇市| 河西区| 怀化市| 巴南区| 瓮安县| 凌云县| 赣州市| 浏阳市| 山西省| 巴彦县| 扶风县|